Helena Biosciences: Emergency Heating Plant Replacement 

The Brief 

Flowtec was engaged by Helena Biosciences to urgently replace a condemned heating plant room at their Sunderland site. The failure had left the facility without heating and hot water, creating significant operational risk and requiring immediate action. 

The project demanded a fast, efficient solution with minimal disruption to business operations. 

Our Approach 

We responded quickly to assess the situation and develop a practical replacement plan. Working to a tight two-week timeframe, we prioritised speed without compromising on quality or safety. 

Our team coordinated the removal of the existing system and installation of the new plant, ensuring all works were completed efficiently and in line with compliance requirements. 

Outcome 

The new heating and hot water systems were installed and fully operational within two weeks, restoring full functionality to the site. The client was able to resume normal operations quickly, with a reliable and efficient system in place. 


★★★★★

“Flowtec responded quickly and delivered exactly what we needed under pressure. Their ability to complete the work in such a short timeframe without compromising quality was impressive.”

Services Delivered 

Removal of condemned heating plant 

Design and installation of new plant room 

Installation of commercial heating systems 

Pipework and system integration 

Testing, commissioning, and system optimisation